How long drying takes, as a window, not a promise

IICRC S500 defines the classes. The standard is paywalled, so this tool does not quote its tables. The windows are editorial trade ranges for a labelled class, and they stretch when wet materials are left in place.

3–5 days Class 2, with demo, if the building is open An editorial window, not an S500 quotation. Class 2 is significant absorption into walls and carpet. The job ends when the moisture log hits the drying goal.

Class 1 is the shortest window, Class 4 (hardwood, plaster, concrete) the longest. Leaving wet drywall in place on a Class 2 or 3 loss stretches the window. Equipment running without a log is noise, not drying. Confirm with daily meter readings. HyreRestore does not dry buildings.

Class in, a window out

Editorial ranges. The log ends it. Nothing is emailed.

Equipment window
What that class means here
When it ends

What this assumed

Editorial trade windows for a labelled class, not a quotation from S500. HyreRestore does not dry buildings.

Questions this calculator answers

How long does water damage take to dry?
Often a few days of equipment if the class is low and wet materials come out. Specialty drying (Class 4) is weeks. The calendar is not the deliverable — the moisture log is.
What is IICRC class?
A label for how much water reached how much material. Class 1 least, Class 3 greatest amount, Class 4 specialty materials. S500 is the standard; this page does not reproduce it.
Can I just run fans?
Uncontrolled airflow can drive moisture into clean rooms. Containment and a drying goal are the difference between drying and spreading.

Sources and methodology

Figures dated 23 August 2026. Last reviewed .